WBMLP EV Charger Bid Documents

WBMLP Headquarters
WBMLP Headquarters

West Boylston Municipal Light Plan is soliciting bids for a Public EV Charging Project located at the Goodale Park parking lot in West Boylston, MA. Electronic bids must be received at the West Boylston Municipal Light Plant by 2:00 PM on Thursday, November 10, 2022. At such time and place said bids shall be publicly opened.

This page contains all pertinent Bid Documents and Specifications for viewing and download.

EV PROJECT BID DOCUMENTS

EV CHARGING STATIONS INSTALLATION LEGAL NOTICE & SPECIFICATIONS:
View and download PDF ▾


APPENDIX PDF FILES:

Appendix A: Site Plans with Instructions & Electrical One-Line Drawings ▾
Appendix B: Chargepoint® CPE250 Installation Guide on Pad with Conduits ▾
Appendix C: Chargepoint® CPE250 Site Design & Installation Guide ▾
Appendix D: Metering & Distribution Pedestal Specifications ▾
Appendix E: Removable Steel Bollard ▾
Appendix F: Prevailing Wage Schedule ▾

ADDENDUM:

Addendum 1: EV Charging Station Installation Project ▾
Back to top